Factory
One base, six process steps, auditable on site
Process sequence
Tooling first: a new enclosure means a new mould, and the mould defines tolerances for everything downstream. SMT follows, then DIP for connectors and larger parts, then assembly, aging and functional test.
| Step | Output |
|---|---|
| Tooling | Mould, T1 samples, dimensional report |
| SMT | PCBA with AOI inspection |
| DIP | Connectors and through-hole parts soldered |
| Assembly | Finished unit with serial record |
| Aging | Continuous-run burn-in |
| Test | Functional test report per batch |
What a buyer can check
On an audit visit you can walk the mould shop, the SMT line and the assembly floor, and ask for the batch records behind any shipped unit. Material lots, mould numbers and work orders are kept so defects can be traced to a process step.
Capacity and lead time
Capacity and lead time are quoted per project against material status and mould readiness. Common materials are scheduled against the order; private tooling needs T1 approval before mass production.
FAQ
Related
Send product direction, target quantity, invoicing requirement and expected delivery window; engineering and sales reply within working hours.